July, 2024
MacGregor, K5028-4HD – Instalation Hoisting Gearbox
Crane Type : MacGregor, K5028-4HD
Location : Muara Berau / Samarinda / Indonesia
Job Order : On Site – Installing Gearbox Holding
Gearbox Holding was damaged and previously SeaCrane Asia Service team was deployed and succesfully dismantling holding Gearbox.
After incoming new gearbox, SeaCrane Asia Service team deploying to installing gearbox holding
Additional Job : Replacing Hydraulic Oil Motor
After succesfully installing gearbox, SeaCrane Asia Service team found that hoisting winch wont operated normally.
SeaCrane Asia Service experience Engineer then performing Trouble shooting and found that Hydraulic Oil motor was over leakaged and need to be Replaced.
After replacing Hydraulic Oil Motor, Crane able to operating Normally and ready to Cargo Operation.