September, 2024 – Mac Greggor Crane – Inspection Job

September, 2024 – Mac Greggor Crane – Inspection Job

September, 2024

Mac Greggor Crane – Inspection Job

Crane Type  : MacGreggor GLB3528 22828gr

Location : Salira Port – Cilegon

Job Order : On Site – General Inspection Crane


In preparation for docking activities, the ship should carry out an inspection first to determine what parts must be done during docking

Seacrane Asia Service Team contacted for crane inspection job. To determine whether the crane needs repairs or not during docking.

 

MacGreggor Crane – General Inspection Crane

 

August, 2024 – SCM Crane – Cant lift maximum capacity

August, 2024 – SCM Crane – Cant lift maximum capacity

August, 2024

SCM Crane – Cant lift maximum capacity

Crane Type  :  SCM YQHG 3150 80T – 13M / 5T – 47M

Location :  PHE / OSES / South East Sumatera

Job Order  :  On Site – Trouble Shooting Luffing System


Above Java Sea, an AWB Crane suddenly trouble when operated. Causing operational disturb and delay job process.

Seacrane Asia Service Team contacted for unexpected trouble crane on vessel. Crane cannot lifting its maximum capacity.

After remote assist was carried out and the problem was unsolved, the Seacrane Asia team was sent to the location.

 

SCM Crane – Cant lift maximum capacity

 

August, 2024 – Tsuji Crane – Trouble Shooting Crane During Cargo Loading

August, 2024 – Tsuji Crane – Trouble Shooting Crane During Cargo Loading

August, 2024

Tsuji Crane – Trouble Shooting Crane During Cargo Loading

Crane Type : Tsuji

Location : Bunati / Tanah Bumbu / South Kalimantan

Job Order : On Site – Trouble Shooting Crane


When Vessel must operated normally but unexpected trouble happens, its difficult time for everyone to face

Seacrane Asia Service Team contacted for unexpected trouble crane on vessel, there were Crane 1 slewing itself when hoist up and Crane 4 intermittent stop. With limited time due to cargo loading activities, remote assist actions was difficult choice and need to go on board as soon as possible.

With the spirit of independence, Seacrane Asia Service Team then deploying to vessel.

Tsuji Crane – Trouble Shooting Crane During Cargo Loading

August, 2024 – MacGregor K5036-4HD-CC3000, Trouble Shooting Luffing System

August, 2024 – MacGregor K5036-4HD-CC3000, Trouble Shooting Luffing System

August, 2024

MacGregor K5036-4HD-CC3000, Trouble Shooting Luffing System

Crane Type : MacGregor K5036-4HD-CC3000

Location : Kaliorang / Kutai Timur / Indonesia

Job Order : On Site – Trouble Shooting Luffing System


During loading cargo operation, suddenly luffing boom crane wont operate, many error message showing up either on monitor and MC card, jib cannot parking in boom rest and its dangerous position for crane.

The Seacrane Asia Service Team was then contacted, after remote assist was carried out and the work was unsuccessful, the Seacrane Asia team was sent to the location.

Main Problem : Luffing Hydraulic Oil Motor overleakaged

After securing jib on boom rest, then Seacrane Asia Service Team carrying out several actions and found that the luffing hydraulic motor oil had an internal leak and had to be replaced immediately.

Unfortunately, spare parts are not available on board.

After providing a short course in installing motor luffing oil, Seacrane Asia Service Team left the job site.

MacGregor K5036-4HD-CC3000, Trouble Shooting Luffing System

July, 2024 – IHI Crane, Replacement Slewing Bearing Crane

July, 2024 – IHI Crane, Replacement Slewing Bearing Crane

July, 2024

IHI Crane, Replacement Slewing Bearing Crane

Crane Type  : IHI

Location : Surabaya / Indonesia

Job Order : Jetty – Replacement Slewing Bearing Crane


Slewing bearing is critical part at crane. When its damaged, crane will not able to operated.
To replaced it, its need specified time and location. Also need experienced engginer to execute.

Seacrane Asia Service Team was contacted for Supervised Replacement Slewing Bearing 2 cranes for only 1 night (without flattness)

After time and location fixed, Experienced Engineer Seacrane Asia Service Team deploying to location

IHI Crane, Replacement Slewing Bearing Crane

 

July 2024 – MacGregor, K5028-4HD – Instalation Hoisting Gearbox

July 2024 – MacGregor, K5028-4HD – Instalation Hoisting Gearbox

July, 2024

MacGregor, K5028-4HD – Instalation Hoisting Gearbox

Crane Type      :      MacGregor, K5028-4HD

Location          :      Muara Berau / Samarinda / Indonesia

Job Order        :      On Site – Installing Gearbox Holding


Gearbox Holding was damaged and previously SeaCrane Asia Service team was deployed and succesfully dismantling holding Gearbox.

After incoming new gearbox, SeaCrane Asia Service team deploying to installing gearbox holding

Additional Job :  Replacing Hydraulic Oil Motor

After succesfully installing gearbox, SeaCrane Asia Service team found that hoisting winch wont operated normally.

SeaCrane Asia Service experience Engineer then performing Trouble shooting and found that Hydraulic Oil motor was over leakaged and need to be Replaced.

After replacing Hydraulic Oil Motor, Crane able to operating Normally and ready to Cargo Operation.

MacGregor, K5028-4HD – Instalation Hoisting Gearbox Picture

June, 2024 – MacGregor, K5028-4HD – Dismantling Hoisting Gearbox

June, 2024 – MacGregor, K5028-4HD – Dismantling Hoisting Gearbox

June, 2024

MacGregor, K5028-4HD – Dismantling Hoisting Gearbox

Crane Type : MacGregor, K5028-4HD

Location : Muara Berau / Samarinda / Indonesia

Job Order : On Site – Dismantling Gearbox Holding


During normal cargo operation, suddenly crane stop working and error 58 appear on MacGreggor control card.

Seacrane Asia Service Team was then contacted, and after remote assist trouble shooting, problem found from Damaged Gearbox Hoisting.

Seacrane Asia Service Team then deploying to Dissambly Gearbox Holding on site.

MacGregor, K5028-4HD – Dismantling Gearbox Holding Picture

 

Mei, 2024 – Kawasaki Crane – Replacement Hoisting Staffa Motor

Mei, 2024 – Kawasaki Crane – Replacement Hoisting Staffa Motor

Mei, 2024

Kawasaki Crane – Replacement Hoisting Staffa Motor

Crane Type      :      Kawasaki

Location          :      Sailing Cilegon – Muara Jawa

Job Order        :      On Site – Replacement Hoisting Staffa Motor


During loading cargo activities, crane reported noise coming when hoist operation. After remote assist, the noise was thought to come from the hoisting motor

Seacrane Asia Service Team then sent on board for Replacing Staffa Motor Hoisting.

 

Kawasaki Crane – Replacement Hoisting Staffa Motor

 